Passing the period from "Buy it" to "Use it", to meet the company's needs and the needs of the construction market rental company Nikken RI_SU scaffolding has been established. Over 50 years of development, legacy of the parent company in Japan, Nikken International Asia Vietnam has been established. Providing products for scaffolding rental, scaffolding solutions to meet the shortage step in Vietnam, we want to create a trusted partner in Vietnam.

Company always staying ahead of scaffolding rental

With the purpose in reusing materials, reducing costs, the company built in Japan using scaffolding hire over 90%. Since its foundation, Nikken Lease provides qualitied and safe products all over Japan. Consistently rated as the number 1 company in Japan for 50 consecutive years, the Company has extended its scope, offerring consulation and meeting customer needs.

The steps of the rental sector

Since its founding, scaffolding rental company Nikken Ri-su always thinking three essential issues (Items needed, when needed, time required), concentration for the purpose of rental, development branch of the lease term. The company topped business efforts help to create social and environmental cleanup. The specific activities, through effective rental, environmentally friendly, contribute to social development.

Safety is our destiny

We manufacture these products safe for users, setting the product quality, reduce 40% of the casualties in scaffolding construction assembly. The process of assembly and high-tech safety.

Technical improvements

We are constantly developing new technologies, new materials, meet the majority of buildings in the form of complex and multi-tiered, wide space. Advanced planning and scale of development and modernization. Our company is always at the forefront developing innovative scaffolding techniques since 1980. In 1985, the development team completed CAD, 2D CAD system development, 3D, advanced scaffolding techniques. Support assembly and installation of scaffolding at a construction site, sending technicians to the site.

NK Support System

NK Support System

Main Features

1. Working process is shortened.
Because of being used both as shoring and scaffolding, NK supports which are used as a stage to operate concrete form, bar arrangement can be applied to concrete form’s shoring changelessly so it can save labor, Working process is shortened.
4. Simple structure
Because joints of components are fixed by plugging and driving with a wedge, assembling, disassembling is very easy and speedy.
2. Strong bearing power
Bearing power of one NK support is twice as strong as frame shoring (frame leg) and it can be assembled easily.
5. Easy shipment
Can carry out components from small holes such as manholes.
3. Improvement of working ability.
Compared with frame shoring, supports‘ distance can be larger the braces are not arranged at each span. They can be easily moved so have excellent working abilities.
6. Because of hot dip zincing, rust can be prevented excellently.

Usage

Box culverts・public tunnels・underground railways・bridge piers・bridges・sewage treatment plants of nuclear power stations ・ temporary stages・work houses.


Forms assembling

① Bottom assembling ④ Couplings
② Underground ⑤ Install by floor
③ Connection pipe installing ⑥ Finish installing

Scaffold frame

Advantages

Can use in a variety as scaffold, shoring,...

Assembling framework scaffold and notes

  • Basis
    Please pay attention to assembly the first floor because the method of assembling this floor will dominate the entire scaffold. Install the base under the vertical and use base jack to adjust height if necessary.
    In addition, please set up a scaffold plank having an appropriate tangent area under the base if the ground is soft.
  • Horizontal bar
    Set up one horizontal bar each five layers, but if there is scaffold plank, scaffold plank could replace the horizontal bar.
  • Wall tie
    It can withstand tensile force and compressive force. Set up one wall tie each three layers and four spans. In the case there is mesh, set up one wall tie each two layers and two spans.
  • Corner connecting bar
    Connecting bar must be set up at the corners of the framework scaffold to connect scaffold in two directions.
  • Limit of the load
    The uniformly distributed load on the plank each span is 3.92KN or less (approximately 0.4 ton), the center concentrated load is 1.96KN or less (approximately 0.2 ton).
    Therefore, it's suggested not to apply a load on two or more places of the frame simultaneously . Allowable loads are different depend on each type of the frame.

External scaffolding assembly sequence


Scaffold Frame Scaffold Frame Scaffold Frame

Relate products introduction

Expamle Demonstration-Concert Event

Project model

We introduce the service of the temporary housing materials rental of NIA (Nikken international Asia) from large-scale construction to special construction by various scenes in the whole country. We introduce a part of the introduction results here.

Ringroad Project

Ringroad Project
№1

Construction of bridge

NK Support and guidance
Radius 9
153m long x 15m wide x 6m high



Ringroad Project

 

Nhat Tan Bridge Project

Nhat Tan Bridge Project
№2

Bridge structure

Support and guidance: NK
Width 32m

Width inside 7m x  Height 18m




Nhat Tan Bridge Project

 

Nhat Tan Bridge Project

Nhat Tan Bridge Project
№3
Bridge structure

Support and guidance: NK

Width 35m x Width inside 10m x  Height 3m


DOBOKU 3S Project
 
Width 8m x Width inside 6m x  Height 3m


Nhat Tan Bridge Project

 

 

Ringroad Project

Ringroad Project
№4
Bridge project 

Support and guidance: NK
Width 8m x Height 6m



Ringroad Project

 

Thang Long Industrial ParkⅡ

Thang Long Industrial ParkⅡ
№5
Construction

Support and guidance: NK
Width 210m x Height 20m



Thang Long Industrial ParkⅡ
 

LOTTE

LOTTE
№6
Construction

Support and guidance: NK
Width 100m x Height 15m



LOTTE
 

Thang Long Industrial ParkⅡ

Thang Long Industrial ParkⅡ
№7
Constructs base and building
Support and guidance: NK
Width 20m x Width inside 80m x Height 4m


Thang Long Industrial ParkⅡ
 

Concert Event

Concert Event
№8
Event

Support and guidance in Concert Project: NK
Width 50m x Width inside 15m x Height 23m




Concert Event
Concert EventConcert Event

 

Warehouse

Support and guidance: NK
Scaffolding and Management System

Warehouse Warehouse Warehouse Warehouse